Ground Operations · Revenue Teams · Europe
End-to-end warehouse management, inbound/outbound handling, scanner integration, and real-time operational visibility.
0
data entry delay
10-Day
Go-Live SLA
24/7
Engineer Support
Belli rebuilt ground operations from first principles for revenue management teams in United Kingdom — not as a bolt-on to a legacy core. Ground operations are where cargo physically moves — and where most operational failures occur. Belli digitizes the entire warehouse workflow. European air cargo is governed by the most complex regulatory environment in the world including EU ICS2 and ACC3 requirements.
Operators routing through Amsterdam (AMS) and Paris CDG (CDG) — carriers in the class of Lufthansa Cargo, airBaltic — face the same pressure: more volume, tighter slots, and zero tolerance for a load plan that leaves revenue on the ramp. Belli's ground operations targets a measurable outcome — 0 data entry delay — and goes live in 10 days for teams operating in United Kingdom, not 12–18 months. United Kingdom deployments inherit the same SLA.
On the ground in United Kingdom, the failure points are concrete.
Belli replaces that with a single platform tuned for United Kingdom's requirements:
Before Belli: Paper-based warehouse processes. No real-time shipment visibility. Manual scanner data entry creating 4-hour data delays. After Belli: Fully digital warehouse operations. Real-time shipment tracking. Zero data entry delay from scanner integration.
Belli's ground operations runs as one connected workflow, configured for United Kingdom from day one.
In practice, that means real-time operational dashboards and alerts, warehouse management with zone/slot allocation, and outbound build-up and aircraft loading coordination. Belli also covers inbound acceptance and breakdown workflows against United Kingdom's specific constraints. Every step is auditable, and changes deploy continuously rather than in quarterly batches.
Running cargo in United Kingdom means living inside its rules, not around them. European air cargo is governed by the most complex regulatory environment in the world including EU ICS2 and ACC3 requirements.
That shows up in the details: EU ICS2 mandatory pre-arrival cargo data filing; slot-constrained airports requiring precise capacity planning; and ACC3 designation required for all carriers operating into EU airports. United Kingdom adds its own layer — preDICT pre-loading data requirements post-Brexit. CHIEF/CDS customs system migration. Carriers such as Lufthansa Cargo, airBaltic, IAG Cargo operate against exactly these conditions.
Go-live is measured in days, and the date is contractual. Master data and partner connections are stood up against a real test load. Training runs in parallel, not after the fact. Post-launch, changes ship continuously rather than waiting for a quarterly release.
The bottom line for revenue management teams is direct. Manual workflows do not just cost hours — they cost yield on every departure. 0 data entry delay is the outcome Belli is engineered to deliver. Carriers like Lufthansa Cargo, airBaltic, IAG Cargo already operate at this standard. The next step is a working demo, not a six-week sales cycle.
Ground Operations
✗ Before Belli
Paper-based warehouse processes. No real-time shipment visibility. Manual scanner data entry creating 4-hour data delays.
✓ After Belli
Fully digital warehouse operations. Real-time shipment tracking. Zero data entry delay from scanner integration.
At a glance · United Kingdom
Decision Makers
Head of Revenue Management, VP Commercial, CFO
Buying Triggers
Revenue target miss, competitor pricing pressure, board mandate for cargo profitability
United Kingdom — specific requirements
PreDICT pre-loading data requirements post-Brexit. CHIEF/CDS customs system migration.
Key cargo hubs · Europe region
Airlines in the region
FAQ
How fast can Revenue Management Teams in United Kingdom go live with Belli's Ground Operations?
Belli's 10-day go-live SLA applies from contract signature — whether you run a single station such as Amsterdam (AMS) or a multi-hub network across Europe. Data migration, EDI connections, and operator training are included in the 10 days, versus the 12–18 months legacy vendors quote.
Does Belli's Ground Operations meet United Kingdom regulatory requirements?
Yes. United Kingdom deployments handle PreDICT pre-loading data requirements post-Brexit. CHIEF/CDS customs system migration. Belli ships with the compliance workflows Europe operators need out of the box — including UK PreDICT post-Brexit customs requirements — so you are not building integrations after go-live.
Which Europe carriers run cargo operations like ours?
Carriers across the region — including Lufthansa Cargo, airBaltic, IAG Cargo — operate the same booking-to-revenue workflows Belli automates, much of it routing through Amsterdam (AMS).
What measurable result does Belli's Ground Operations deliver?
Fully digital warehouse operations. Real-time shipment tracking. Zero data entry delay from scanner integration. Typical outcome: 0 data entry delay, with monthly close completed within 10 business days.
Who in our organization owns the buying decision?
For Revenue Management Teams, the decision typically involves Head of Revenue Management, VP Commercial, CFO. Common triggers: Revenue target miss, competitor pricing pressure, board mandate for cargo profitability.
Replace your legacy CMS in 10 days
Talk to a live cargo software engineer 24/7